Industrial Facilities
Boiler Makers Training Facility
Renovation of existing building to accommodate new training facility
Allen Park, MI
Henkel Technologies
Existing Building Renovations
Madison Heights, Michigan
· Building No.2 New Cafeteria construction.
· Building No.1 Office renovations
· Building No. 1 & 3 Accelerated Testing Labs
· Building No.3 Office and Lab additions
· Building No. 2 L.I.S. relocation
· Oak Creek Wisconsin Tech labs
WJR Fuel Fill
Installation of diesel fuel piping, valves & controls
Detroit, Michigan
Zenith Industries
Office and Shop Renovations
Roseville, Michigan
De-Sta-Co Manufacturing
Office and Shop Renovations
Troy, Michigan
Automotive Systems Lab
Building B-12 Compressor
Farmington Hills, Michigan
Automotive Systems Lab
Building D-1 East
Farmington Hills, Michigan
Cardell Manufacturing
#2 Stamping Plant
Hazardous Materials Room
Auburn Hills, Michigan
American Axle & Manufacturing
Detroit, Michigan
Various projects thru-out complex
Including but not limited to the following:
· Plant No. 1 Break Room Renovation
· Plant No. 6 Lunch room Renovation
· Plant No. 3 Telephone Comm. Rm. Renovation
· Plant No. 6 Office Relocation
· Second Floor Server Staging Room Renovation
· 9 ½” Assembly Line Exhaust System
· 9 ½ & 10 ½ Assembly Lines, Slug Welder Cooling Water System
· Acid Piping System Alterations (Forge Plant)
· Smog Hog #1, #3 & #4 Installation (Forge Plant)
· Plant No. 3 Shot Blast Exhaust System (Forge Plant)
· Gage Crib Area HVAC Addition (Forge Plant)
· Plant No. 2 Heating Renovations (Forge Plant)

Potapa - Van Hoosear
Engineering, Inc.
48653 Van Dyke Ave.
Shelby Twp., MI
48317(PH)
586-997-0922
(FX) 586-997-0912